Friday, September 20, 2013

How to Copy Any File using UTL_FILE

While UTL_FILE.FCOPY can be used to copy valid text files, it does not copy binary files or invalid text files.  An example of an invalid text file would be one that contains a character sequence that cannot be generated by the characters on your keyboard (i.e. the sequence of two CR's in a row on a Windows platform rather than CRLF, CRLF) and hence may be considered a binary file.

NOTE: As UTL_FILE first supported the reading and writing of binary files in 10gR1, this note can only be used with Oracle Database versions 10gR1 and later.
Solution
  1. Create two directory objects for the IN and OUT file locations.
CREATE OR REPLACE DIRECTORY in_file_loc AS 'C:\temp\in';
CREATE OR REPLACE DIRECTORY out_file_loc AS 'C:\temp\out';

NOTE: You must have the CREATE ANY DIRECTORY privilege to execute these statements.

  1. Create the procedure CopyFile.
-- Procedure to COPY a Text or Binary file

CREATE OR REPLACE PROCEDURE copyfile (
   in_filename                IN             VARCHAR2
 , out_filename               IN             VARCHAR2
)
IS
   in_file                                           UTL_FILE.file_type;
   out_file                                          UTL_FILE.file_type;
   buffer_size                              CONSTANT INTEGER := 32767;   -- Max Buffer Size = 32767
   buffer                                            RAW (32767);
   buffer_length                                     INTEGER;
BEGIN
   -- Open a handle to the location where you are going to read the Text or Binary file from
   -- NOTE: The 'rb' parameter means "read in byte mode" and is only available
   --       in the UTL_FILE package with Oracle 10g or later
   in_file                                                  :=
                                                              UTL_FILE.fopen ('IN_FILE_LOC', in_filename, 'rb', buffer_size);
   -- Open a handle to the location where you are going to write the Text or Binary file to
   -- NOTE: The 'wb' parameter means "write in byte mode" and is only available
   --       in the UTL_FILE package with Oracle 10g or later
   out_file                                                 :=
                                                            UTL_FILE.fopen ('OUT_FILE_LOC', out_filename, 'wb', buffer_size);
   -- Attempt to read the first chunk of the in_file
   UTL_FILE.get_raw (in_file, buffer, buffer_size);
   -- Determine the size of the first chunk read
   buffer_length                                            := UTL_RAW.LENGTH (buffer);

   -- Only write the chunk to the out_file if data exists
   WHILE buffer_length > 0
   LOOP
      -- Write one chunk of data
      UTL_FILE.put_raw (out_file, buffer, TRUE);

      -- Read the next chunk of data
      IF buffer_length = buffer_size
      THEN
         -- Buffer was full on last read, read another chunk
         UTL_FILE.get_raw (in_file, buffer, buffer_size);
         -- Determine the size of the current chunk
         buffer_length                                            := UTL_RAW.LENGTH (buffer);
      ELSE
         buffer_length                                            := 0;
      END IF;
   END LOOP;

   -- Close the file handles
   UTL_FILE.fclose (in_file);
   UTL_FILE.fclose (out_file);
EXCEPTION
   -- Raised when the size of the file is a multiple of the buffer_size
   WHEN NO_DATA_FOUND
   THEN
      -- Close the file handles
      UTL_FILE.fclose (in_file);
      UTL_FILE.fclose (out_file);
END;
/

  1. Test procedure CopyFile with both Text and Binary files.

-- Test a TEXT file
EXEC CopyFile('original_textfilename.txt', 'new_textfilename.txt')

-- Test a BINARY File
EXEC CopyFile('original_binaryfilename.jpg', 'new_binaryfilename.jpg') 

Check the IN_FILE_LOC and OUT_FILE_LOC and verify that the files were successfully copied.  Compare the actual size in bytes to make sure they are an exact copy. 


Top of Form
Bottom of Form

Data flow for Order-to-Cash cycle





1. Order Entry
This is first stage, When the order is entered in the system, it creates a record in order headers and Order Lines table.
·        Enter header details: Once you enter details on the order header and save it or move it to  
         lines, record goes to one table oe_order_headers_all.
             .        No record exists in any other table for this order till now.
·        Enter Line details for this order: Enter different item numbers, quantity and other details
         in line tab. When the record gets saved, it goes to one table. Order header details will be
         linked with line details by order HEADER_ID.
2. Order Booking
This is next stage, when Order is booked then the Flow status changed from Entered to Booked. At this stage, these below table get affected.
·        oe_order_headers_alL
·        oe_order_lines_all
·        wsh_delivery_details
·        wsh_delivery_assignments
*In shipping transaction form order status remains “Ready to Release”.
At the same time, Demand interface program runs in background and insert into inventory tables mtl_demand.
3. Reservation
This step is required for doing reservations SCHEDULE ORDER PROGRAM runs in the background and quantities are reserved. Once this program get successfully get completed, the mtl_demand and mtl_reservations table get updated.
4. Pick Release
Pick Release is the process of putting reservation on on-hand quantity available in the inventory and pick them for particular sales order.
Pick release can be done from ‘Release Sales Order’ form or ‘Pick release SRS’ program can be scheduled in background. In both of these cases all lines of the order gets pick released depending on the Picking rule used. If specific line/s needs to be pick release it can be done from ‘Shipping Transaction form. For this case Pick Release is done from ‘Release Sales Order’ form with Pick Confirm=NO.
Once pick release is done these are the tables get affected:
·        If step 3 is not done then MTL_RESERVATIONS gets updated now.
·        wsh_new_deliveries
·        wsh_delivery_assignments
·        wsh_delivery_details
·        MTL_TXN_REQUEST_HEADERS
·        MTL_TXN_REQUEST_LINES
·        Mtl_material_transactions_temp
·        MTL_SERIAL_NUMBERS_TEMP
·        MTL_SERIAL_NUMBERS
*In shipping transaction form order status remains “Released to Warehouse” and all the material still remains in source sub-inventory. We need to do Move Order Transaction for this order. Till this no material transaction has been posted to MTL_MATERIAL_TRANSACTIONS
5. Pick Confirm/ Move Order Transaction
Items are transferred from source sub-inventory to staging Sub-inventory. Here material transaction occurs.
Order line status becomes ‘Picked’ on Sales Order and ‘Staged/Pick Confirmed’ on Shipping Transaction Form.
·        MTL_MATERIAL_TRANSACTIONS_TEMP
·        oe_order_lines_all
·        MTL_MATERIAL_TRANSACTIONS
·        mtl_transaction_accounts
·        wsh_delivery_details
·        wsh_delivery_assignments
·        MTL_ONHAND_QUANTITIES
·        MTL_SERIAL_NUMBERS_TEMP
·        MTL_SERIAL_NUMBERS
* This step can be eliminated if we set Pick Confirm=YES at the time of Pick Release 
6. Ship Confirm
Here ship confirm interface program runs in background. Data removed from wsh_new_deliveries. 
The items on the delivery gets shipped to customer at this stage.
·        oe_order_lines_all
·        wsh_delivery_details
·        WSH_SERIAL_NUMBERS
·        mtl_transaction_interface
·        mtl_material_TRANSACTIONS
·        mtl_transaction_accounts
·        mtl_demand, MTL_reservations
·        MTL_ONHAND_QUANTITIES
·        MTL_SERIAL_NUMBERS_TEMP
·        MTL_SERIAL_NUMBERS
7. Enter Invoice 
After shipping the order the order lines gets eligible to get transferred to RA_INTERFACE_LINES_ALL. Workflow background engine picks those records and post it to RA_INTERFACE_LINES_ALL. This is also called Receivables interface, that mean information moved to accounting area for invoicing details. Invoicing workflow activity transfers shipped item information to Oracle Receivables. At the same time records also goes in the table RA_INTERFACE_SALESCREDITS_ALL which hold details of sales credit for the particular order.
ra_interface_lines_all (interface table into which the data is transferred from order management) Then Auto-invoice program imports data from this table which get affected into this stage are receivables base table. At the same time records goes in ra_customer_trx_all and ra_customer_trx_lines_all
8. Complete Line
In this stage order line level table get updated with Flow status and open flag.
oe_order_lines_all
9. Close Order
This is last step of Order Processing. In this stage only oe_order_lines_all table get updated. These are the table get affected in this step.

oe_order_lines_all
oe_order_HEADERS_all


1. Order Entry
This is first stage, When the order is entered in the system, it creates a record in order headers and Order Lines table.
·        Enter header details: Once you enter details on the order header and save it or move it to lines, record goes to one table oe_order_headers_all flow_status_code = ENTERED, booked_flag = N), Primary key=HEADER_ID
o        No record exist in any other table for this order till now.
·        Enter Line details for this order: Enter different item numbers, quantity and other details in line tab. When the record gets saved, it goes to one table. Order header details will be linked with line details by order HEADER_ID. oe_order_lines_all (flow_status_code = ENTERED, booked_flag = N, open_flag = Y) Primary key= LINE_ID
2.Order Booking
This is next stage, when Order is booked then the Flow status changed from Entered to Booked. At this stage, these below table get affected.
·        oe_order_headers_alL (flow_status_code as BOOKED, booked_flag updated to Y)
·        oe_order_lines_all (flow_status_code as AWAITING_SHIPPING, booked_flag updated Y)
·        wsh_delivery_details (DELIVERY_DETAIL_ID is assigned here, released_status ‘R’ ready to release, LINE_ID comes as SOURCE_LINE_ID)
·        wsh_delivery_assignments (DELIVERY_ASSIGNMENT_ID is assigned for DELIVERY_DETAIL_ID present in wsh_delivery_details, DELIVERY_ID remains blank till this stage)
*In shipping transaction form order status remains "Ready to Release".
At the same time, Demand interface program runs in background And insert into inventory tables mtl_demand, here LINE_ID come as a reference in DEMAND_SOURCE_LINE
3. Reservation
This step is required for doing reservations SCHEDULE ORDER PROGRAM runs in the background and quantities are reserved. Once this program get successfully get completed, the mtl_demand and mtl_reservations table get updated. LINE_ID gets updated in DEMAND_SOURCE_LINE_ID in both the tables.
4. Pick Release
Pick Release is the process of putting reservation on on-hand quantity available in the inventory and pick them for particular sales order.
Pick release can be done from 'Release Sales Order' form or 'Pick release SRS' program can be scheduled in background. In both of these cases all lines of the order gets pick released depending on the Picking rule used. If specific line/s needs to be pick release it can be done from 'Shipping Transaction form. For this case Pick Release is done from 'Release Sales Order' form with Pick Confirm=NO.
Once pick release is done these are the tables get affected:
·        If step 3 is not done then MTL_RESERVATIONS gets updated now.
·        wsh_new_deliveries (one record gets inserted with SOURCE_HEADER_ID= order header ID, status_code=OP =>open)
·        wsh_delivery_assignments (DELIVERY_ID gets assigned which comes from wsh_new_deliveries)
·        wsh_delivery_details (released_status ‘S’ ‘submitted for release’)
·        MTL_TXN_REQUEST_HEADERS
·        MTL_TXN_REQUEST_LINES (LINE_ID goes as TXN_SOURCE_LINE_ID)
·        (move order tables. Here request is generated to move item from Source (RM or FG) sub-inventory to staging sub-inventory)
·        Mtl_material_transactions_temp (link to above tables through move_order_header_id/line_id, this table holds the record temporally)
·        MTL_SERIAL_NUMBERS_TEMP (if item is serial controlled at receipt then record goes in this table)
·        MTL_SERIAL_NUMBERS (enter value in GROUP_MARK_ID )
*In shipping transaction form order status remains "Released to Warehouse" and all the material still remains in source sub-inventory. We need to do Move Order Transaction for this order. Till this no material transaction has been posted to MTL_MATERIAL_TRANSACTIONS
5.Pick Confirm/ Move Order Transaction
Items are transferred from source sub-inventory to staging Sub-inventory. Here material transaction occurs.
Order line status becomes 'Picked' on Sales Order and 'Staged/Pick Confirmed' on Shipping Transaction Form.
·        MTL_MATERIAL_TRANSACTIONS_TEMP (Record gets deleted from here and gets posted to MTL_MATERIAL_TRANSACTIONS)
·        oe_order_lines_all (flow_status_code ‘PICKED’ )
·        MTL_MATERIAL_TRANSACTIONS (LINE_ID goes as TXN_SOURCE_LINE_ID)
·        mtl_transaction_accounts
·        wsh_delivery_details (released_status becomes ‘Y’ => ‘Released’ )
·        wsh_delivery_assignments
·        MTL_ONHAND_QUANTITIES
·        MTL_SERIAL_NUMBERS_TEMP (record gets inserted after putting details for the item which are serial controlled at 'Sales order issue')
·        MTL_SERIAL_NUMBERS (record gets inserted after putting details for the item which are serial controlled at 'Sales order issue')
* This step can be eliminated if we set Pick Confirm=YES at the time of Pick Release

6.Ship Confirm
Here ship confirm interface program runs in background. Data removed from wsh_new_deliveries.
 
The items on the delivery gets shipped to customer at this stage.
·        oe_order_lines_all (flow_status_code ‘shipped’)
·        wsh_delivery_details (released_status ‘C’ ‘Shipped’, SERIAL_NUMBER if quantity is ONE)
·        WSH_SERIAL_NUMBERS (records gets inserted with the DELIVERY_DETAIL_ID reference, only in case of shipped quantity is two or more)
·        mtl_transaction_interface
·        mtl_material_TRANSACTIONS (linked through Transaction source header id)
·        mtl_transaction_accounts
·        Data deleted from mtl_demand, MTL_reservations
·        Item deducted from MTL_ONHAND_QUANTITIES
·        MTL_SERIAL_NUMBERS_TEMP (records gets deleted from this table)
·        MTL_SERIAL_NUMBERS (Serial number stauts gets updated CURRENT_STATUS=4 , 'Issued out of store')
7.Enter Invoice
After shipping the order the order lines gets eligible to get transfered to RA_INTERFACE_LINES_ALL. Workflow background engine picks those records and post it to RA_INTERFACE_LINES_ALL. This is also called Receivables interface, that mean information moved to accounting area for invoicing details. Invoicing workflow activity transfers shipped item information to Oracle Receivables. At the same time records also goes in the table RA_INTERFACE_SALESCREDITS_ALL which hold details of sales credit for the particular order.
ra_interface_lines_all (interface table into which the data is transferred from order management) Then Autoinvoice program imports data from this table which get affected into this stage are receivables base table. At the same time records goes in
ra_customer_trx_all (cust_trx_id is primary key to link it to trx_lines table and trx_number is the invoice number)
ra_customer_trx_lines_all (line_attribute_1 and line_attribute_6 are linked to order number and line_id of the orders)
8.Complete Line
In this stage order line level table get updated with Flow status and open flag.
oe_order_lines_all (flow_status_code ‘shipped’, open_flag “N”)
9.Close Order
This is last step of Order Processing. In this stage only oe_order_lines_all table get updated. These are the table get affected in this step.

oe_order_lines_all (flow_status_code ‘closed’, open_flag “N”)
oe_order_HEADERS_all